After the construction of the dam, [[Willowshore]]’s old dock was blocked off, thus requiring the construction of a new dock at the mouth of the Ceiba River. The new dock is operated and managed by [[Rajul Samudra]] (*male nagaji shipwright*), who was hired by the Ceiba-Duyue Exchange specifically for his boatbuilding skills.
**Wares:** river boat rentals and sales